Rio Grande Valley Assembly Hall
Click here to view the Rio Grande Valley 58,000 SF Assembly Hall Overview
The overview includes
- Steel Frame Erection Process
- Pre-Engineered Steel Frames
- HTT Panel Layout on Slab
- Pouring Concrete in HTT Panels
- HTT Poured & Ready to Lift
- Enclosing Main Hall
- Main Building & Lobby Erection Processes
- Sprayed Insulation, Framing & Exterior Prep for Finishes